Search intent: engineering solution and supplier evaluation | Sichuan Zhongke Glass Co., Ltd commissioned a ceramic catalytic filter line on furnace 3# in December 2018, then a second line covering the oxygen-enriched furnaces 1#, 2# and 3# in May 2021, both under a BOT arrangement with fully managed third-party operation. This article sets out what the project record contains, what an oxygen-enriched furnace changes in the selection criteria, and how the operating signals should be read. Measured values below belong to a filed typical application case on the same process route, labelled as a benchmark rather than as measurements from this owner.
1. What the project record shows
ZTW Tech publishes its project list as a page on this site, and that list is the authoritative record of customer names, project scope and commissioning dates. Two entries belong to this owner, and the second differs from the first in a way that matters.
- 3# glass melting furnace flue gas ceramic catalytic tube desulfurization, denitrification, defluorination and dust removal integrated project - December 2018 - BOT model, fully managed third-party operation
- 1#, 2# and 3# oxygen-enriched glass melting furnace flue gas desulfurization, denitrification, defluorination and dust removal integrated project - May 2021 - BOT model, fully managed third-party operation
| Project element | Registered content |
|---|---|
| Owner | Sichuan Zhongke Glass Co., Ltd, glass melting |
| First line | Furnace 3#, ceramic catalytic tube integrated project, December 2018 |
| Second line | Oxygen-enriched furnaces 1#, 2# and 3#, integrated project, May 2021 |
| Operating model | BOT model with fully managed third-party operation on both entries |
Two consequences follow. Within roughly two and a half years a second line was added for a different furnace type on the same site, and both run under a BOT arrangement rather than by the owner's own staff. Reagent purchasing, differential pressure management and element inspection therefore sit inside an operating contract with defined performance obligations.
2. Why an oxygen-enriched furnace changes the selection criteria
An oxygen-enriched furnace is not the same duty as an air-fired one. A contractor's public report on an oxygen-enriched glass furnace line at another plant in Sichuan describes the flue gas as carrying water content up to 56.42 percent and a main flue temperature 500 to 600 degrees Celsius higher than an air-fired furnace. Those are third-party descriptions of the duty, quoted to explain why the criteria move, not performance data here.
| Selection criterion | What the oxygen-enriched duty changes |
|---|---|
| Reaction temperature margin | SCR runs between 220 and 400 degrees Celsius, peaking at 280 to 400. A hotter, wetter gas needs a larger cooling duty |
| Corrosion resistance | Water vapour far above the air-fired level raises condensation risk on ductwork and the reactor shell, so materials and insulation matter more |
| Dust character | A more aggressive combustion regime changes flue gas volume and temperature, so filter area must be derived from the oxygen-enriched duty |
| Chamber isolation | One chamber can be isolated for regeneration or element replacement while the rest keep running, decisive for a line that cannot be taken offline |
| Element pressure drop | The ultra-low-resistance ceramic fibre element is rated at 80 to 150 Pa per metre at 1 m/min, letting a shorter element replace a longer one in the same space |
| Operating model | Under a BOT contract the operating data must be structured for contractual verification, not just troubleshooting |
The element used on this route is described on the NO and NO2 denitrification chemistry page, and the reactor arrangement behind the registered scope on the integrated process page.
3. Measured performance for the same route, with its conditions
The measured figures below come from typical application case number 793 of the China Association of Environmental Protection Industry, covering the 15,000 m3/h glass melting furnace flue gas treatment project of Sichuan Yibin Universal Glass Manufacturing Co., Ltd. The project entered service on 1 May 2017 and was accepted on 11 October 2017, with all indicators met or below the contractual targets, and the case content was confirmed by seal by both the owner and the applicant. These are same-route measured values for an air-fired furnace, not measurements from the Sichuan Zhongke line and not an oxygen-enriched result.
| Indicator | Inlet or condition | Measured outlet | Condition it depends on |
|---|---|---|---|
| NOx | above 3,000 mg/m3 | below 100 mg/m3 | Holds while the gas stays above 280 degrees Celsius, so no extra heating fuel is required |
| HF | above 38 mg/m3 | below 5 mg/m3 | Fluoride comes from the glass batch, so the dry route needs an alkaline absorbent |
| SO2 | - | below 5 mg/m3 | Ca(OH)2 dry desulfurization at 20 kg/h |
| Particulate matter | - | below 5 mg/m3 | The element performs SCR denitrification and dust removal together |
| Ammonia slip | - | below 5 ppm | 20 percent ammonia solution atomised; depends on nozzle and mixing quality |
| System pressure drop | - | below 3,500 Pa | The equivalent conventional train exceeds 4,500 Pa, over 20 percent fan energy saved |
The plant configuration behind that case is also public: 416 ceramic filter elements in a four-chamber arrangement, 1,306 square metres of total filtration area, reactor design pressure below 2,500 Pa, total investment of 6 million CNY and annual operating cost of about 1.88 million CNY. The dry reagent reaction products are captured on the element surface and discharged with the ash, and at a glass furnace they can be returned to the batch as raw material, so the route produces no waste for disposal and no wastewater stream.
4. Reading the operating signals under a BOT contract
On a BOT line the operating record is also the contractual record, so the signals that decide whether performance is met decide profitability as well.
| Signal | First check | What it usually means |
|---|---|---|
| Differential pressure rising while outlet NOx stays normal | Absorbent dosing rate and actual gas volume, from reagent consumption and flue gas CO2 | Dust loading or over-dosing, not catalyst decay |
| Outlet NOx rising while differential pressure stays normal | Whether flue gas temperature is still above 280 degrees Celsius and catalyst activity is retained | Reaction temperature out of the active band; check before adding heating fuel |
| Desulfurizer consumption rising | Sulfur, fluorine and chlorine content of the incoming batch | A feed-side change rather than an equipment fault |
| Ammonia slip rising | Nozzle atomisation and the static mixing section | Over-spray or poor mixing; lowering the spray rate first would turn an ammonia problem into an NOx problem |
5. Frequently Asked Questions
What is the operating record of these two lines?
The project list registers a ceramic catalytic tube integrated line on furnace 3# in December 2018 and a second line covering the oxygen-enriched furnaces 1#, 2# and 3# in May 2021, both under a BOT model with fully managed third-party operation. Counting to November 2026, the first line has run about 7 years 11 months and the second about 5 years 6 months. The list records names and dates only, so no performance figure follows from it.
Can an oxygen-enriched furnace use the same design as an air-fired one?
Not without recalculation. An oxygen-enriched furnace carries higher water content and a higher flue gas temperature, so the cooling duty, the corrosion allowance and the filter area must all be derived from that duty. The reactor is still the same multi-chamber ceramic arrangement, and one chamber can still be serviced while the others run.
How long does the element last?
The product warranty is 5 years and the maximum usable life is 8 to 10 years, and the same-route filed case records catalyst life above 5 years. A conventional SCR catalyst in the same dusty, alkali-bearing service is normally budgeted at 2 to 4 years. Actual life depends on heat release and dust load, so the replacement point should follow operating data.
What does a BOT arrangement mean for the owner?
The contractor builds, owns and operates the line and recovers its investment through the operating contract, so the owner takes a service tariff instead of running the plant. For a technical reviewer the consequence is that acceptance is defined by contracted outlet limits and measured data, which is why the acceptance dates and measured stack concentrations are the items to request before comparing proposals.
What should be checked before comparing proposals?
Four items: the commissioning and acceptance dates, the measured stack concentrations before and after treatment with the operating conditions attached, the flue gas volume and temperature the design was derived from, and the operating model the reference plant runs under today.
6. Technical basis
ZTW Tech's ceramic catalytic tube multi-pollutant coordinated control technology is listed in the 2018 National Catalogue of Advanced Pollution Prevention and Control Technologies (Air Pollution Control) issued by the Ministry of Ecology and Environment, and the ceramic catalytic integrated flue gas multi-pollutant coordinated control technology is listed in the 2020 National Catalogue of Major Environment Protection Technologies and Equipment for Encouraged Development issued jointly by the Ministry of Industry and Information Technology, the Ministry of Science and Technology and the Ministry of Ecology and Environment.